Bids invited to hire equipment for operations at Nakrakonda-Kumardih B UG CollieryIllustrative image – not actual.

Eastern Coalfields has invitd bids for winning coal without blasting from the designated mine at Nakrakonda-Kumardih B UG Colliery of Bankola area.

The scope covers deploying equipment, such as a Continuous miner, two shuttle/battery haulers, a feeder breaker, roof bolters, a multi utility vehicle-1, auxilliary fan, pumps, pipes & fittings, communication system along with allied electricals on hiring basis. It also includes a scientific study for obtaining DGMS permission for the introduction of continuous miner package in the mine and strata monitoring as required.  During the contract period, the successful bidder has to achieve annual guaranteed production (AGP) as per targets fixed for respective annual production periods (APP) which is as under: first to nith APP: 0.51 MT each. The duration of the contract is nine production years.

Bidders are required to submit their proposals by 27 March, 2026.

← All latest storiesBack to top →