Bids invited to construct railway bridgesIllustrative image – not actual.

Ircon International has invited bids for construction of three railway bridges.

The bridges will come up on stilt at ch 148.04 to ch 145.524 (bridge length 720 mtr.), ch 150.200 to ch 150.530 (bridge length 330 mtr) and ch 153.285 to ch 153.909 (bridge length 624 mtr) in Coastal Regulation Zone-I area of Dahanu-Detour in connection with construction of Western Dedicated Freight Corridor Phase-II Vaitarna-Sachin section of Maharashtra.

The estimated value of the project is Rs 148.29 crore with completion period of 12 months.

 

← All latest storiesBack to top →