Illustrative image – not actual.Irrigation & CAD Department, Andhra Pradesh has invited bids for works of Pula Subbaiah Veligonda project.
The scope of work involves construction of balance work of Tunnel-2 of 9.20 mtr internal diameter for a length of 7575 mtr (from 11.212 km to 18.787 km) with existing tunnel boring machine including excavation of link canal at exit of tunnel in LS contract system in Andhra Pradesh under Pula Subbaiah Veligonda project.
The estimated value of the project is Rs 528.35 crore.
The scope of work involves construction of balance work of Tunnel-2 of 9.20 mtr internal diameter for a length of 7575 mtr (from 11.212 km to 18.787 km) with existing tunnel boring machine including excavation of link canal at exit of tunnel in LS contract system in Andhra Pradesh under Pula Subbaiah Veligonda project.
The estimated value of the project is Rs 528.35 crore.
