Illustrative image – not actual.
Bangalore Water Supply & Sewerage Board has invited bids for a wastewater treatment plant project.
Bids have been invited in three separate packages:
-
Design & construction of 150 MLD wastewater treatment plant based on activated sludge process with biological nutrient removal along with power generation and operation and maintenance of the wastewater treatment plant, including minor and major repairs to all the equipment, supply of all spares required for the operation of the plant, supply of oil and lubricants, supply of supervisory and security staff, maintenance of gardens and trees, except power charges, inclusive of all incidental items of work round the clock for a period of 10 years at V Valley, Nayanadana Halli, Mysuru Road, on turnkey basis. The estimated cost of the project is Rs 605.9 crore.
-
Design & construction of 150 MLD wastewater treatment plant based on activated sludge process with biological nutrient removal along with power generation and operation and maintenance of the wastewater treatment plant, including minor and major repairs to all the equipment, supply of all spares required for the operation of the plant, supply of oil and lubricants, supply of supervisory and security staff, maintenance of gardens and trees, except power charges, inclusive of all incidental items of work round the clock for a period of 10 years at K & C Valley, Nagasandra, on turnkey basis. The estimated cost of the project is Rs 352 crore.
-
Design & construction of 40 MLD wastewater treatment plant based on sequencing batch reactor process with biological nutrient removal at Doddabele, and operation and maintenance of the wastewater treatment plant, including minor and major repairs to all the equipment, supply of all spares required for the operation of the plant, supply of oil and lubricants, supply of supervisory and security staff, maintenance of gardens and trees, except power charges, inclusive of all incidental items of work round the clock for a period of 10 years, on turnkey basis. The estimated cost of the project is Rs 119 crore.