Jodhpur Vidyut Vitran Nigam (JDVVNL) has invited bids for SITC of grid connected solar power plants in various sub-divisions in Sardarsahar in Rajasthan.
The scope covers design, survey, supply, installation, testing, commissioning of the plants located across Bhadasar Dikhnada, Bhanipura, Sardarsahar (Rural), under Churu Circle KUSUM Scheme-Component C. The power plants will be set up through Renewable Energy Service Company (RESCO) mode, with the value of the contract estimated at Rs 655.97 crore.
The project developer will be required to install the associated 33 kV or 11 kV line linking the solar power projects to the relevant substations, and also includes setting up the bay, breakers, and metering system at the substation, with an operation & maintenance period of 25 years.
The due date for bid submission is 03 January, 2024.