Illustrative image – not actual.
The Public Works Department, Uttar Pradesh, has invited bids for a road widening project.
The scope of work includes widening of Palwal-Tappal-Aligarh Road (SH-22A) from two lane to four lane, Ch 15.660 to 77.000 km & four laning bypass to Jattari Abadi (5.50 km) & Khair Abadi (10.00 km) (total length 67.500 km).
The estimated cost of the project is Rs 417 crore. The completion period of the project is 24 months.
