Illustrative image – not actual.
National Highways Authority of India (NHAI) has invited bids for road upgradation in Rajasthan under Bharatmala Pariyojna.
The project involves upgradation to two lane with paved shoulder/ four lane of Gagaria-Baori Kalan-Serwa-Bakhasar section of NH-925 (design chainage 0.000 to 136.520) and Sata-Gandhav section of NH-925A (design chainage 0.000 to 60.450) (total length 196.970 km) under Bharatmala Pariyojna, on EPC mode.
The estimated value of the project is Rs 902.6 crore with a completion period of 24 months.
