North Central Railway has invited bids for the following works:
Earthwork in embankment/cutting including blanketing, side drains, retaining/toe wall, construction of minor bridges and removal of infringements of signaling cables/equipments with other allied works in Bijroutha-Babina section (35.58 km) in connection with Bina-JHS 3rd line project (Zone-IV). The estimated cost of the project is Rs 100 crore.
Construction of major bridges (16 nos.) and earthwork in approaches, including protection and other ancillary works in Lalitpur-Jhansi section (89.91 km) in connection with Bina-Jhansi 3rd line project (Zone-B) in Uttar Pradesh. The estimated cost of the project is Rs 142.32 crore.