Illustrative image – not actual.The National Highways and Infrastructure Development Corporation (NHIDCL) has invited bids for the comprehensive development, maintenance, management, and operation of a major greenfield high-speed corridor connecting Meghalaya and Assam.
Designated as Package-3, the contract involves upgrading the stretch from Mawlyngkhung near Shillong in Meghalaya to Panchgram near Silchar in Assam into a four-lane highway with paved shoulders. The contracted developer will be allocated a completion timeline of 36 months to fully execute the construction and engineering phase. It is structured to be executed under the hybrid annuity model (HAM), with an estimated cost of development pegged at Rs 5,003.67 crore. Once operational, this greenfield corridor will drastically enhance connectivity, reduce transit times, and boost regional trade logistics across northeastern India.
The final date for bidder submissions is scheduled for 03 August, 2026.
