Illustrative image – not actual.
Maharashtra Metro Rail Corpn has invited bids for construction of the metro corridor.
The scope of work includes construction of the metro corridor of 10.795 km length, including design and construction of an elevated viaduct of 9.250 km between Pimpri Chinchwad MC & Range Hill; and construction of elevated viaduct on BOQ basis of length 430 mtr from Ch 6694 to Ch 7124 near Harris bridge; 1.000 km from Ch 2600 to Ch 3600, 28 mtr from Ch 7709 to Ch 7737 & 87 mtr from Ch 8691 on the North-South corridor of Pune metro rail project in Maharashtra.
The project is to be completed in 27 months.
