Illustrative image – not actual.
Western Railway has invited bids for the constrution of a major bridge between Pitol-Jhabua section in Madhya Pradesh.
The scope of work includes major bridge no. 60 and other miscellaneous works between Katwara-Pitol-Jhabua section, in connection with new BG line project between Dahod-Indore of Ratlam Division.
The period of construction is nine months, and entails an oultay of Rs 122.1 crore.
The last date for bid submission is 08 April, 2024.
