Illustrative image – not actual.
Ircon International has invited bids for construction of a cable-stayed bridge project.
The scope of work includes construction of the cable-stayed bridge including its approaches across Anji Khad river between Tunnel T2 and T3 on Katra-Banihal section of Udhampur Srinagar-Baramulla Rail Link Project in Jammu & Kashmir (PKG-BR-Anji Khad-BRIDGE).
The estimated cost of the project is Rs 388.37 crore. The project is scheduled to be completed in 36 months.
