Bids invited for BRTS in ChennaiIllustrative image – not actual.

The Bus Rapid Transit System (BRTS) in Chennai has finally begun to take shape, with the Pallavan Transport Consultancy Services (PTCS) calling for a tender for preparation of a Detailed Project Report (DPR). A feasibility study has already been carried out by the Institute for Transportation and Development Policy (ITDP).

BRTS will connect unserved areas and will complement existing public transport modes, including Metro Rail, proposed monorail, MTC and suburban train network. There will be a dedicated bus lane separated from the general traffic and facilities found at Metro Rail stations can be expected at BRTS stations as well.

Those participating in the tender need to specify the requirements on road geometries, station infrastructure, bus bays, bus terminals, feeder routes, lane intersections, intersection redesign, pedestrian crossways, skywalks, passenger amenities, lightings and bus body building design requirements along with requisites for efficient BRT network services and facilities and suitable information technology and system applications required for operating it. It also seeks integration with non-motorised transport (NMT) infrastructure, and other public transport modes, operation and maintenance systems, project management unit, institutional structure and suitable implementation strategy.

ITDP has recommended a total of seven corridors covering Rajiv Gandhi Salai (OMR), Sardar Patel Road, GST Road in south Chennai and Koyambedu, Ambattur, Poonamalee and Madhavaram in west Chennai. The corridors cover 96.70 km and 121 stations have been identified.

The corridors are - Koyambedu to Poonamallee (14 km), Koyambedu to Ambattur (7.7 km), Koyambedu to Madhavaram (12.40 km), Saidapet to Siruseri (24.80 km), Saidapet to Tambaram (18.20 km), Thoraipakkam to Chromepet (10.60 km) and Koyambedu to Saidapet (9 km).

← All latest storiesBack to top →