Illustrative image – not actual.
Bangalore Metro Rail Corporation (BMRCL) has invited bids for construction of elevated structures in Reach-6 line of the Bangalore metro rail project, Phase-II.
The scope of work includes construction of the elevated structure (viaduct and stations) in length of 7.50 km from Gottigere to Swagath road cross, including Kothnur Depot, entry line, road widening and allied works and five nos. of metro stations, viz. Gottigere, Hulimavu, IIMB, JP Nagar 4th Phase, and Swagath road cross.
The estimated cost of the proposed work is Rs 575.52 crore.
