Bids invited for an intermediate lane of Hunli to Hayuliang section in Arunachal PradeshIllustrative image – not actual.

National Highways & Infrastructure Development Corporation (NHIDCL) has invited bids for the construction of an intermediate lane in Arunachal Pradesh.

Under Package-I, the work entails construction of an intermediate lane with a hard shoulder of Hunli to Hayuliang from km 0.000 to km 53.000 (design length 53.000 km, greenfield) Section of Frontier Highway (NH-913) in the state.

Similarly, Package-III involves construction of an intermediate lane of Hunli to Hayuliang from km 60.000 to km 121.500 (design length 61.500 km, greenfield) Section of Frontier Highway (NH-913).

Work on these Package-I and Package-III are valued at Rs 822.75 crore and Rs 905.7 crore, respectively. These packages will be executed on engineering, procurement, and construction (EPC) mode. The completion period is scheduled for 36 months, with DLC for 60 months.

The last date to bid for these packages is 20 February, 2024.
 

← All latest storiesBack to top →