Illustrative image – not actual.Bids have been invited by North Western Railway for Marwar-Mavli railway stretch covering a distance of 152 km in Rajasthan.
The scope of work includes carrying out the final location survey, geo-technical studies, design, preparation of drawings, and other preliminary activities, and working out actual realistic cost & ROR estimation in connection with gauge conversion project between Marwar-Mavli.
The estimated time for the work is 12 months.
