Illustrative image – not actual.Bhubaneswar city is set to connect all 450 slum settlements to its sewerage network as part of ongoing efforts to strengthen urban sanitation and water infrastructure.
In a recent meeting chaired by Bhubaneswar MP Aparajita Sarangi, Water Corporation of Odisha (WATCO) Managing Director Debabrata Mohanty outlined plans to integrate the remaining areas into the city's sewerage system. Currently, the city faces a deficit of about 65 MLD in potable water supply. To address this, a 130 MLD capacity water treatment plant (WTP) is under construction at Mundali, along with a 30 MLD capacity master balancing reservoir at Sikharchandi. These projects aim to bolster water supply to around 730 apartment complexes. Looking ahead, a proposal for an additional 400 MLD water treatment plant is being considered to meet future demand by 2047, in line with the vision of Viksit Bharat.
Regular water quality monitoring is also in place to ensure safe and reliable supply, with internal laboratories and departmental staff involved in sample collection.
