Illustrative image – not actual.Bharat Heavy Electricals (BHEL) has won the order to set up a 120 MW Vyasi hydroelectric power project in Dehradun district of Uttarakhand.
The order worth Rs 125 crore, has been awarded to the company by Uttarakhand Jal Vidyut Nigam (UJVNL).
The scope of work involves design, manufacture, supply, installation and commissioning of hydro generating sets and associated electro mechanical works. While the hydro generating sets shall be supplied by BHEL's Bhopal unit, the transformers, and the control and monitoring system will be supplied by the company's Jhansi unit and electronics division, Bangalore, respectively. The erection and commissioning of the equipment shall be carried out by BHEL's power sector-northern region (PS-NR).
The project is a run-of-the-river scheme on the river Yamuna. Water from the Vyasi reservoir will be diverted by constructing an 86 mtr high dam through a 2.7 km long head race tunnel, to the surface power house at Hathiari village. The project comprises two hydro generating sets of 60 MW each, with vertical Francis turbines.
Related Link:
Project profile
