BHEL bags two ordersIllustrative image – not actual.

BHEL has bagged an order worth Rs 5,778 crore from Elena Power & Infrastructure for setting up two thermal power projects (TPP) in Maharashtra, involving five new-rating units of 270 MW each.

The projects are located at Nashik (5x270 MW) and Amravati (5x270 MW), both in Maharashtra.

BHEL's scope of work includes design, engineering, manufacture, supply, erection and commissioning of steam turbines, generators and boilers, along with associated auxiliaries and electricals, besides state-of-the-art controls & instrumentation and electrostatic precipitators (ESP).

The turbine generators and boilers are to be manufactured at the company's Haridwar (Uttarakhand) and Trichy (Tamil Nadu) plants respectively, and the C&I systems will be supplied by BHEL's Electronics Division, Bangalore. The company's Hyderabad plant will manufacture the coal mills and boiler feed pumps, while the electricals will be supplied by BHEL's Bhopal (Madhya Pradesh) and Jhansi (Uttar Pradesh) plants. BHEL's Ranipet (Tamil Nadu) plant will manufacture and supply the ESPs.

Also See:

BHEL floats tender for Anpara project (24-Feb-10)

← All latest storiesBack to top →