Illustrative image – not actual.Bharat Heavy Electricals (BHEL) has bagged a
switchyard contract from Nuclear Power Corporation of India (NPCIL). The
contract is worth Rs.41 crore.
As per the contract, BHEL would set up a 400 kV switchyard for evacuating power from upcoming units III and IV (225 MW each) at the Kaiga Atomic Power Plant in Karnataka to feed the southern grid. The contract would be executed within 8 months.
