Bharat Heavy Electricals Ltd (BHEL) has bagged an order for the supply of equipment for two power plants of 23 MW and 12.5 MW capacities for Grasim Industries’ two cement divisions, viz. Aditya Cement in Rajsthan and the South division in Tamil Nadu.
The two power plants are estimated to cost Rs.146
crore and are expected to be ready within 18 months. BHEL would also be the EPC
contractor for the power plants.
