Illustrative image – not actual.
Bharat Heavy Electricals (BHEL) has secured an order for turbine generator (TG) and associated packages for the greenfield two x 660 MW Khurja Super Thermal Power project in Bulandshahr district of Uttar Pradesh.
The value of the order is around Rs 1,600 crore and has been placed on BHEL by THDC India, a joint venture of the government of India and the government of Uttar Pradesh.
The scope of work includes design, engineering, manufacture, supply, erection, testing and commissioning of the TG and associated packages for the supercritical power project.
The company envisages indigenous manufacturing and sourcing of both the Turbine-Generator sets for this project. The equipment for the project will be manufactured at BHEL's Haridwar, Bhopal, Hyderabad, Jhansi, Trichy, Thirumayam and Bengaluru plants.
The complete system engineering of the package will be carried out by the company's Project Engineering Management (PEM) division and construction and installation activities on-site will be carried out by the company's Power Sector -- Northern Region Division, Noida, Uttar Pradesh.
