Illustrative image – not actual.Bharat Heavy Electricals (BHEL) has bagged a Rs.355 crore order from National Hydro-Electric Power Corporation to set up the Parbati power project.
The 800 MW power project would come up in Himachal Pradesh. The power station would be equipped with the pelton hydro turbines.
BHEL would execute the order within 52 months.
