Illustrative image – not actual.North Eastern Electric Power Corporation (NEEPCO) has awarded Bharat Heavy Electricals, a Rs.74 crore order, for supply of hydro generating equipment to the 2x30 MW Tuirial project in Mizoram.
The order envisages design, manufacture, supply, erection and commissioning of two vertical hydro turbines of 30 MW each with matching generators.
The Tuirial hydel project, which is being funded by the Japan Bank of International Cooperation, is slated for completion in 2006.
The project involves electricity generation by utilising a 53 metre waterhead of river Tuirial, a tributary river of Barak which flows through southern Assam.
