Illustrative image – not actual.BGR Energy Systems has bagged two orders from the Nuclear Power Corporation of India (NPCIL) worth Rs 431 crore.
The following orders have been secured by BGR Energy:
Design and detailed engineering, manufacture, procurement, supply, etc of 400 kV and 230 kV switchyards and BoP electrical areas for Kudankulam Nuclear Power projects - 3 and 4 for a total value of Rs 344.83 crore.
Loading/unloading, transportation and handling at site, storage, civil works, etc of 400 kV and 230 kV switchyards and BoP electrical areas for Kudankulam Nuclear Power projects - 3 and 4 entailing an investment of Rs 86.21 crore.
The completion period for the works is 60 months.
