BGR Energy bags Rs.4,900 crore Kali Sindh power project contractIllustrative image – not actual.

BGR Energy Systems bagged an EPC contract worth Rs.4,900.06 crore from Rajasthan Rajya Vidyut Utpadan Nigam for the 2 x 600 MW Kali Sindh coal based power project in Jhalawar district.

The scope of work includes design, engineering, supply of boiler, steam turbine generator and complete balance of plant equipments inclusive of all mechanical, electrical, instrumentation and control syatems and civil, structural and architectural works. The EPC contract will be executed over 39 months for Unit I and 42 months for Unit II.

The project will have two of Asia's tallest natural draft cooling towers, These cooling towers will be disigned and built by the company in-house.

Related Links:
Project profile

← All latest storiesBack to top →