Illustrative image – not actual.
A proposal to introduce a high-speed train service between Bengaluru-Mysuru has been dropped as not feasible.
The Rail Vikas Nigam and High Speed Rail Corporation had jointly conducted a survey of the existing rail link between the two cities and found that running trains in excess of 160 km per hour on the stretch was not feasible owing to too many track curvatures.
