BEML flags off last train set for Kolkata Metro East-West ProjectIllustrative image – not actual.

BEML flagged off the last train set for Kolkata Metro (East-West) project from its Metro coach factory at Bengaluru Complex in Karnataka.

BEML secured the contract for 14 train sets (six cars each) valued at approximately Rs 900 crore from the Kolkata Metro Rail Corporation (KMRC).

BEML independently completed design, manufacturing activities and delivery of the proto type train set was done during March 2018, which was subjected to extensive testing and trials on KMRC mainline, including statutory testing by RDSO and CRS.

Subsequently, BEML-built KMRC train sets were put to revenue operation since February 2020 and are operating satisfactorily.

Further, six train sets are ready for deployment in the revenue operation. The revenue service was inaugurated by Minister of Railways & Commerce Piyush Goyal on 13 February 2020 at Kolkata.

Some of the key features of the train sets include stainless steel car body furnished with world-class interiors and customised air-conditioning suiting local requirements. Bogie for 750V DC third rail application is designed and developed by BEML for the first time.

IGBT-based microprocessor controlled three-phase asynchronous drive with Variable Voltage Variable Frequency (VVVF) control and regenerative braking for energy saving.

The train sets operate with ATP/ATO and are interfaced with CBTC signalling system to reduce headway, ensure train stopping accuracy and passenger safety.

Passenger capacity is 2,068 persons per train set, with energy-efficient LED lights.

 

← All latest storiesBack to top →