Illustrative image – not actual.
BEML has been declared as the lowest bidder (L1) for a rolling stock contract which involves the supply of 210 coaches for the 116.1 km Chennai Metro Phase-II project by Chennai Metro Rail (CMRL).
BEML emerged as L1 in a competitive process, with the coaches designated for operation on the new 45.4 km Line-3 (Madhavaram-Siruseri SIPCOT) and 44.6 km Line-5 (Madhavaram-Sholinganallur).
The supply of standard gauge coaches is configured as 70 trainsets of three cars each. It also includes a comprehensive 15-year maintenance agreement. The manufacture, supply, testing, commissioning, and training of personnel for the metro rolling stock, in addition to maintenance of depot machinery and plant.
BEML and Titagarh Rail Systems participated, with reports indicating that BEML's bid was approx. Rs. 14.7 crore per coach.
