Illustrative image – not actual.Bihar Chief Minister Samrat Choudhary inaugurated the construction of the Belwa Dhar Link Channel in Sheohar district under the Bagmati-Burhi Gandak River Link Project on 19 July, 2026.
The project marks a significant step towards strengthening flood control, irrigation infrastructure and water resource management in North Bihar. The inauguration ceremony was held at Belwa village in Piprahi block, with the channel expected to play a key role in transferring surplus water from the flood-prone Bagmati river basin to the Burhi Gandak river system. According to the Bihar Water Resources Department, the link channel is designed to reduce flooding in vulnerable regions while improving irrigation potential and ensuring better utilisation of available water resources.
By diverting excess river water, the project aims to minimise flood damage, enhance agricultural productivity and support long-term regional development.
