Barmer-Mundra Pipeline Project: Engineers India to do feasibility studyIllustrative image – not actual.
New Page 1

Oil & Natural Gas Corporation has roped in Engineers India to undertake a technical feasibility study for the Barmer-Mundra Pipeline project.

Cairn India has also appointed an international consultant to undertake a feasibility study to transport crude oil from Barmer, Rajasthan, to a nearby port city. ONGC is a 30 per cent partner with Cairn India in the fields.

The feasibility study on the technical aspects of the pipeline takes priority, as the crude from Rajasthan requires a proper heating arrangement. The crude from Rajasthan is heavy with high wax content and requires specialised pipelines to transport it from Barmer. The feasibility study will also bring out the issue of cost recovery and the size of pipeline that is required.

Crude from Rajasthan will begin flowing from 2009.

Also See:

Cairn reaches agreement with ONGC on Rajasthan pipeline (25-Jan-07)

Related Links:
Project profile

← All latest storiesBack to top →