Bangalore metro rail proposed, to conduct project feasibility studyIllustrative image – not actual.

The Karnataka state government ordered a feasibility study for a Delhi-type metro rail project for Bangalore city, on 2 August 2002. This follows a presentation by Delhi Metro Rail Corporation (DMRC).

 

The state government has entrusted DMRC with the task of preparing a detailed feasibility study for the proposed 29-km rail line in Bangalore that would have underground, surface and elevated segments as in the Delhi project. DMRC is to complete the study in 6 months. The study is estimated to cost of Rs.4 crore, of which 40 per cent would be the Centre’s contribution.

 

As per the presentation, the light rail project would have an East-West and a North-South alignment, each running 14.5 km. About 3 km in either segment would be underground.

 

The organisational structure, modalities and the estimated cost are yet to be established.

 

 

Related News:

 

Karnataka shelves Bangalore ELRTS project

← All latest storiesBack to top →