Bangalore Development Authority issues tenders for Peripheral Ring Road projectIllustrative image – not actual.

The Bangalore Development Authority (BDA) has called for e-tenders for the 74 km peripheral ring road (PRR) project proposed in 2007 to decongest the city. This is the third time the BDA is calling for tenders for the project.

The project, which is to be renamed as Bengaluru Business Corridor, will be constructed in the public-private partnership model. It is anticipated to cost Rs 27,000 crore and the contract for the same is a 50-year lease period. The cost of the project includes a land acquisition cost of nearly Rs 21,000 crore. The tender notification specified the last day for the bids as 29 February, 2024. The technical bids will be opened on 02 March, 2024.

The eight-lane access controlled expressway will form a semi-circle around the city and slice through the three taluks of Bengaluru North, Bengaluru East and Anekal. The project to be executed under design, build, binance, operate and transfer model (DBOT) mode, will have eight-lanes running to an approx. length of 74 km with service road to Bengaluru City, with a width of 100 mtrs.

Further, it will also include clover leaf junctions, flyovers/underpasses, road over bridges, road under bridges, vehiclular underapss/overpasses, toll plazas, transport zones, culverts, minor and major bridges, utility ducts along the road and a green corridor. A sum of Rs 270 crore will be submitted as deposit.
 

← All latest storiesBack to top →