Illustrative image – not actual.Badarpur Energy is likely to commission Assam's first 6 MW biomass power project at Devendra Nagar in Badarpurghat, close to Silchar by August 2007.
The project is being set up at an approximate cost of Rs.22 crore. Power generated in the plant will be transmitted through a dedicated line to the adjuscent BVCL's plant as well as subsidiary, Cement International's plant and will meet the entire energy requirement of the production facility of Barak Valley Cements and contribute towards conservation of fossil-fuels.
Related Links:
Project
profile
