Illustrative image – not actual.
Azure Power inaugurated a 10 MW solar rooftop power plant in Mohali, Punjab, on 27 July, 2016. This is one of the country’s largest grid-connected solar rooftop projects.
The 10 MW solar rooftop project is spread across eight locations in the state of Punjab. The electricity generated by the plant will be sold to Punjab State Power Corporation at a tariff of Rs 7.59 kWh for a period of 25 years.
