Illustrative image – not actual.
The detailed project report (DPR) for Assam’s first underwater tunnel, spanning 33.7 km between Numaligarh and Gohpur beneath the Brahmaputra, has been completed.
Estimated at Rs 6,000 crore, the greenfield project is set to enhance connectivity and strategic security near the Arunachal Pradesh border. The National Highways and Infrastructure Development Corporation (NHIDCL) prepared and technically appraised the DPR, which will soon be presented for Union Cabinet approval, with final clearance from the Cabinet Committee on Infrastructure.
The Standing Committee of the National Board for Wildlife (NBWL) has recommended a scientific assessment of soil stability, groundwater flow, sediment dynamics, and seismic vulnerability. The tunnel crown will lie approx. 32 mtrs. below the river’s lowest bed, reflecting the engineering complexity. Once approved, construction is expected to take five years, making it India’s first road tunnel beneath a major river and a transformative project for regional transport and defense infrastructure.
