Illustrative image – not actual.
Ashoka Buildcon has received a letter of award (LoA) from the Gujarat Rail Infrastructure Development Corporation (G-RIDE).
The scope of work includes gauge conversion of Bechraji (63.83 km)-Ranuj (101.983 km) section with a total length of 38.153 km metre gauge to broad gauge with 25 kV AC electrification in the Ahmedabad Division of Western Railway.
The project cost is Rs 333.625 crore.
