Illustrative image – not actual.The Government of Andhra Pradesh has commissioned tunnel II of the Srisailam Left Bank Canal (SLBC) project at Nalgonda district of the state.
The state government has commissioned the 7.2 km-long and 10 mtr diametre tunnel II. It has used manual blasting method to give boost to the project. Tunnel II is meant to draw Krishna water into a 7.54 tmc ft capacity artificial lake being created at Teldevarapalli in Dindi Valley.
The Andhra Pradesh Government is developing the Srisailam Left Bank Canal project with an estimated investment of Rs 2,813 crore. It is intended to develop two canals in irrigation areas of the state. The 43.5 km tunnel I of the project is under execution.
Currently, Andhra Pradesh Government has invited bids for improvement to existing cart track / WBM roads with WBM, BT including construction of pipe culverts and cement concrete roads in Thipparthy mandal of Nalgonda district in the command area of D-39 of high level canal of AMRSLBC project in state.
Related Link:
Project profile
