Illustrative image – not actual.
Work on the Kuppam branch canal will begin from Appanapalle village near Punganur branch canal. It will supply drinking water to 4.02 lakh people, besides consolidation of irrigation water source for about 7,000 people through linkage of 110 village tanks.
Phase-II of the Handri-Neeva project in Chittoor district is set to provide irrigation water to 1.82 lakh acre, and drinking water to a population of 10 lakh.
For the benefit of Madanapalle town, summer storage tanks will be constructed with linkage of the Handri-Neeva project.
More Project Info:
Handri-Neeva Irrigation Project
