AP Capital Region Development Authority to implement sewerage scheme by 2019Illustrative image – not actual.
Work is underway on the Andhra Pradesh Capital Region Development Authority (APCRDA) sewerage scheme project at Kondamrajupalem and Rayapudi, zone-6 at Amaravati, capital city in Andhra Pradesh on engineering, procurement and construction (EPC) basis. In 2018,

Larsen & Toubro (L&T) bagged an order worth Rs 363.37 crore and soon commenced work on the project. The scope of work includes ETS survey, geotechnical investigation, design, approval of detailed engineering good for construction (GFC) drawings and construction of roads (BT and PQC), storm water drains, culverts, water supply, sewerage and STP, utility ducts for power and ICT, reuse waterline and avenue plantation compatible with trunk infrastructure being executed along with last mile connectivity (LMC) in respect of water sewerage and storm connectivity.

The project includes performance-based O&M for a period of seven years (including DLP of two years) in layouts for land pooling schemes for the project. As per the latest information shared with Projects Today, work on the project was underway. The sewerage scheme is expected to be complete by December 2019.

← All latest storiesBack to top →