Illustrative image – not actual.Ansaldo STS bagged an order from Kolkata Metro Rail Corporation (KMRCL) in West Bengal.
The order is worth Euro 46 million (approx Rs 310.5 crore). Ansaldo STS will undertake the design, construction, installation and placement into service of the train control, signalling and telecommunication systems of the new KMRCL East – West Line (EWL) in Kolkata. The new KMRCL EWL will be 14.7 km long, will intersect the existing North-South line (16.5 km long, with 24 stations), and will link the township of Howrah with city of Kolkata. 5.8 km of the line will be elevated, and 8.9 km underground, including a 550 mtrs stretch under the river Hooghly. There will be 12 new stations, comprising six underground and six elevated.
The scope of work includes automatic train, protection/operation, centralised operations, integrated telecommunications with TETRA radio system, operational telephones system, closed circuit television surveillance & access control, passenger information system etc. The work, which will begin in October, 2011 is to be completed in 52 months.
Related Links:
Project profile
