Illustrative image – not actual.The Ahmedabad Municipal Corporation (AMC) has invited bids for the construction of a four-lane railway overbridge-cum-elevated corridor on the Ahmedabad–Botad railway line, aimed at improving connectivity between Sarkhej Circle and Sanand–Sarkhej Road.
The contract, estimated at Rs 355.60 crore, will be executed on an engineering, procurement and construction (EPC) mode, The proposed corridor will pass over LC No. 28 and traverse key junctions including L.J. Circle and Sanand Junction along the 60-metre-wide TP road near the SG Highway in Ahmedabad. The EPC contractor will be responsible for complete project execution, including survey, investigation, design, engineering, procurement, construction, and maintenance of the project, ensuring compliance with all technical and safety standards. The scope also includes adherence to performance requirements and timely delivery as per defined milestones.
The project is expected to significantly ease traffic congestion in one of Ahmedabad’s rapidly developing industrial and residential corridors, improve freight and commuter movement, and enhance regional connectivity between Ahmedabad and surrounding industrial zones.
The last date for submission of bids is 05 May, 2026.
