Illustrative image – not actual.
Alstom has begun manufacturing the regional commuter and transit trains for Delhi-Ghaziabad-Meerut Semi-High-Speed Rail Corridor for RRTS Phase-1.
In May 2020, the company was awarded the contract to design, build and deliver 210 regional commuter and transit train cars along with comprehensive maintenance services for 15 years.
As per the contract, Alstom will deliver 30 regional commuter trainsets of six cars each and 10 intra-city mass transit trainsets of three cars each.
In accordance with Aatmanirbhar Bharat vision and the Make-in-India guidelines, these RRTS trains are 100 percent indigenously manufactured, with over 80 percent localisation and are being manufactured in Alstom’s factory in Savli, Gujarat.
This facility will produce the bogies, car bodies and undertake train testing. The propulsion systems and electricals are being manufactured at the company’s factory in Maneja, Gujarat.
The first look of the train for India’s first Regional Rapid Transit System (RRTS) was unveiled in September 2020.
These energy efficient semi-high-speed aerodynamic trains will incorporate latest tech features to provide a superior passenger experience, to all commuters, including the specially-abled. The RRTS corridors will operate the fastest trains in India with a design speed of 180 km per hour.
Alstom’s scope of work also includes designing, supply, installation, testing and commissioning of signalling & train control, supervision, platform screen doors and telecommunication systems for this 82.15 km corridor.
This line will be the first-in-India to adopt the European Train Control System (ETCS) Hybrid Level-2 signalling system, which is the core signalling and train control component of the European Rail Traffic Management System (ERTMS).
