AERB clears equipment installation for Units 5 & 6 at Kudankulam Nuclear Power ProjectIllustrative image – not actual.

The Atomic Energy Regulatory Board (AERB) has approved the installation of critical equipment at Units 5 and 6 of the Kudankulam Nuclear Power Project in Tamil Nadu, marking a key milestone in India’s nuclear energy expansion.

The clearance allows Nuclear Power Corporation of India (NPCIL) to proceed with erecting major components such as reactor pressure vessels, steam generators, and coolant pumps. Kudankulam Units 5 and 6 incorporate advanced safety features aligned with AERB codes for light water reactors. The project, developed with Russian collaboration, consists of six VVER-type pressurised water reactors, each with a capacity of 1,000 MW.

The approval follows a comprehensive, multi-tier safety review covering reactor design, construction progress, and adherence to both national regulations and global benchmarks, including those of the International Atomic Energy Agency. Issued on April 30, the decision builds on earlier clearance granted in April 2021 for the first concrete pour stage. With Units 1 and 2 operational and Units 3 and 4 nearing completion, this progress strengthens India’s clean, reliable power generation capacity.

← All latest storiesBack to top →