Illustrative image – not actual.ABB India has bagged a Rs 125 crore order from PowerGrid Corporation of India, for extension of three sub-stations in Vadodara and Manesar in Gujarat and Malerkotla in Punjab. As per the contract, ABB will upgrade the three substations from air-insulated switchgear (AIS) to Gas-insulated switchgear (GIS).
ABB is expected to commission all three sub-stations be end 2016.
