Illustrative image – not actual.Aban Constructions has bagged Gujarat State Petroleum's (GSPL) Amboli-Dahel pipeline contract. The pipeline would be 45 kms long and 24 inch wide.
The pipeline project, which is
part of GSPL’s 98 km gas grid, is expected to be complete within six months.
The gas grid is set to breach the
river Narmada using the horizontal directional drilling mode.
