Illustrative image – not actual.Karnataka Renewable Energy Development has invited bids from solar technology providers to design, finance, build, operate and maintain solar/hybrid power plants.
This step has been is in response to the state government's plan to launch a self-sustaining solar technology programme in 3,900 villages in 39 most backward blocks to cater to the energy needs of 50 lakh people.
Solar power is to be provided for street-lights, household consumption, entertainment, educational purposes, water-lifting for irrigation, drinking water supply, purification/desalination plants, deflourination, milk pasteurisation and local cottage industrial applications.
The solar power is expected to be metered and made available at a fee determined in advance. The provider who wins the contract can collect fees from users.
