Illustrative image – not actual.The NHAI has restructured the cost of 35 projects in order to attract the interest of private sector bidders in upcoming highways projects.
According to sources, the reduction of costs has been achieved via the elimination of flyovers and service lanes and by reducing the design period from 20 years to 10 years. NHAI has also decided to dole out with the idea of creating service lanes along the entire length of the highway and to restrict it to urban centres which see high volumes of traffic.
The cost for developing the highway between Belgaum and Dharwad has seen a decrease from Rs 702 to Rs 480 crore while the cost of four-laning the highway connecting Amritsar and Pathankot has decreased by about Rs 75 crore.
The authority has decreased the cost of the highway between Valaya and Vadakancheri by about Rs 52 crore. Other projects which have been restructured include the highways connecting the Madhya Pradesh border and Nagpur, Vijaywada and Rajamudri and the Pune-Sholapur highway.
Also See:
