Illustrative image – not actual.
In the pre-bid meeting organised by the Mumbai Metropolitan Region Development Authority (MMRDA), as many as 30 firms have shown interest in the construction of Dahisar (E)-Andheri (E) Metro line on the Western Express Highway (WEH). The estimated completion cost for the 16.5 km Metro project with 16 stations is Rs 6,208 crore which is to be constructed within 30 months.
The entire alignment for construction purpose has been divided into three packages. The first package consists of designing and constructing an elevated viaduct and five elevated stations of Andheri (E), Shankarwadi, JVLR Junction, Mahanand and new Ashok Nagar.
The second package has designing and constructing of an elevated viaduct and six elevated stations of Aarey, Dindoshi, Pathan Wadi, Pushpa Park, Bandongri and Mahindra & Mahindra. The third package consists of designing and constructing an elevated viaduct and five elevated stations of Magathane, Devipada, National Park, Ovaripada and Dahisar (E).
Some of the companies that showed interest included HCC, Reliance Infrastructure, Pratibha Industries, AFCONS, L&T, Dextra India, Tata, Relcon Infra Projects, Simplex Infra, J Kumar Infra Projects, Unity InfraProjects, SEW, KMC Constructions, IL&FS, SOMA, AL FARA' A Infra Projects (UAE).
