Illustrative image – not actual.To address Ludhiana’s alarming groundwater depletion and contamination, a six-km-deep pipeline is being laid from Bilga village to the city under the Bulk Surface Water Supply Project.
The initiative aims to replace the city’s groundwater-based system with a continuous, 24x7 canal water supply, ensuring sustainable and safe drinking water for residents. Deputy Mandal Magistrate Ludhiana (East) Jasleen Bhullar confirmed that necessary approvals from the Drainage Department, PSPCL, and PWD have been secured, and power poles along the route—via Sua road, Nandpur village, and GT Road—are being shifted to facilitate pipeline construction. Cabinet Minister Hardeep Singh Mundian is personally monitoring the project, which is targeted for completion by June 30.
The project is jointly funded by the World Bank (35 percent), Asian Infrastructure Investment Bank (35 percent), and the Punjab Government (30 percent). By transitioning to a canal-based system, Ludhiana seeks to ensure ecological balance, protect groundwater resources, and provide reliable water supply to the city’s population and industrial sectors. “It is aimed at moving from the present groundwater-based intermittent water supply system to canal based, 24x7 water supply system to achieve source sustainability, ecological balance, supply of potable water to consumers at adequate pressure, ICT enabled system with real time monitoring, optimising resource usage with minimum energy consumption and robust network with minimum leakages,” the SDM shared.
